Bio: Zank, Marvin W., Pastor (1928)
Poster: R. Lipprandt
Email: rloss@bellsouth.net

----Surnames: Dermody, Lang, Meyer, Zank

----Source: The Centennial Booklet of Immanuel Ev. Lutheran Church, 1876 - 1976, page 35

Zank, Marvin W. (December 28, 1928)

Pastor Marvin W. Zank, the son of Pastor and Mrs. Walter E. Zank, was born at Route #2, Waterloo, Wisconsin on December 8, 1928.

He attended and completed grade school at St. John‘s Lutheran School, Route #2, Waterloo; high school and college at Northwestern College in Watertown, Wisconsin.

Upon graduation from Northwestern College, he entered the Wisconsin Lutheran Seminary in Thiensville, Wisconsin and graduated in 1953.

His first call was to Grace Lutheran Church in Fort Madison, Iowa, where he was ordained by his father, Pastor Walter E. Zank in July of 1953.

Pastor and Mrs. Zank, the former Miss Joanne Dermody, were married in Milwaukee on July 4, 1953. This union has been blessed with a family of seven children: Steven, Katherine, Karen, Elizabeth, Jane, Richard and Lisa.

He served Grace Lutheran congregation as pastor for a period of two years, when he received a call from the Good Shepherd congregation, Beaver Dam, Wisconsin, in 1955, which he served until 1963.

In the fall of 1963, our congregation directed a call to Pastor Zank and he was installed at Immanuel’s in October of 1963.

During his pastorate in Medford, Immanuel’s congregation can point to many blessings. For some years, our congregation had realized the need of a larger church building with other necessary facilities. These needs were cautiously, yet effectively pursued with the result of necessary additions for worship, Christian education and other related facilities.

In the annual meeting in January 1965, Immanuel’s congregation moved to build a new church building along with other necessary facilities to serve both the congregations well as the school, which was already existing in the location where the new church was to be located.

An architect was engaged in late summer of 1965. Plans and specifications were prepared, discussed and modified over the winter an spring of 1966. Construction contracts were awarded on September 26, 1966 and groundbreaking services were held following services n Sunday, October 2, 1966 when Pastor Zank turned the first shovel of ground, followed by Marvin Lang, President of the congregation and George F. Meyer as chairman of the New Church Building Committee.


 

 

 

 

Submit a Response

 

**This Clark Co., WI Internet Library, ALHN & AHGP website is dedicated to the free sharing of information by researchers, local historians, genealogists and educators.  Because of our non-profit status, submissions are not to be used for profiteering of any kind.   Our representatives cannot accept gratuities beyond the basic expenses (i.e. postage, copying, courthouse or rental fees) for obtaining requested information.  We reserve the right to ban the involvement of anyone who intentionally disregards these policies.   Please show your appreciation for this database by Becoming a Clark County History Buff or making a contribution to our Support Fund and Perpetual Preservation Account to help keep this Clark Co., WI database freely available on the World Wide Web and free from commercial enterprise.

 

*** This copyrighted Clark Co., Wis. genealogy and history material is used by permission of the submitters.  Contact us if anyone is using this data inappropriately.  It may not be copied and posted to any commercial/.com genealogy sites such as Genealogy Trails, Family Tree Maker or the merged companies Ancestry.Com/RootsWeb/MyFamily or sold for profit.

 


Report Broken Links

ALHN & AHGP HOME PAGE

 

This page is a part of the Clark County, WI Internet Library Project

Every submission is protected by the Digital Millennium Copyright Act of 1998.

~~The Clark Co., Wisconsin History Buffs maintain these pages in support of Free On-line History & Genealogy~~